De Beukelaer-Dossche, M.; Vanremoortele, S. (2013). Work, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 111-119
In: De Beukelaer-Dossche, M.; Decleyre, D. (Ed.) (2013). Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. Waterways and Sea Canal (W&SC)/Agency for Nature and Forest (ANB): Antwerp/Brussels. ISBN 9789040303432. 136 pp., more
After the preparatory investigation and the design, the implementation of the project was on the schedule. Before the first spade touched the soil, a specification was drawn up and the necessary permits and licences obtained. Work began on 14 March 2012: the earthworks, the building of the combined inlet and outlet sluice, the construction of the walkway and the digging of the dissipation channel. During the work, close attention was paid to the impact on farmers and local residents.
All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy